Skip to main content

Construction to begin this fall on $10M West Edmonton Mall footbridge

Share
EDMONTON -

Construction will begin this fall on a footbridge between West Edmonton Mall and the Misericordia Community Hospital.

Edmonton city council said the bridge will cost about $10 million to construct.

The plan is to replace the old bridge that crossed 170 Street near 87 Avenue. It was torn down in 2018 after an inspection found it was deteriorating. Because of that, a temporary crosswalk was installed until there was a permanent solution in place.

The removal of the bridge triggered nearby residents to act, sending in letter writing campaigns to City Hall saying they missed the convenience of the bridge.

The city says WEM will cover up to $2 million of the total cost over 30 years.

With files from CTV News Edmonton’s Jeremy Thompson

CTVNews.ca Top Stories

BREAKING

BREAKING Honda to get up to $5B in govt help for EV battery, assembly plants

Honda is set to build an electric vehicle battery plant next to its Alliston, Ont., assembly plant, which it is retooling to produce fully electric vehicles, all part of a $15-billion project that is expected to include up to $5 billion in public money.

Secret $70M Lotto Max winners break their silence

During a special winner celebration near their hometown, Doug and Enid shared the story of how they discovered they were holding a Lotto Max ticket worth $70 million and how they kept this huge secret for so long.

Stay Connected