Southeast LRT delays caused by cracks on piers 'deeply disappointing': mayor
The Valley Line Southeast LRT will not open this summer as planned.
The CEO of TransEd announced at Davies Station on Wednesday cracks had been found on three concrete piers that support the elevated tracks.
After further investigation, the company found a total of 18 piers that "may require strengthening."
"This issue will unfortunately delay the service commencement," TransEd CEO Ronald Joncas said. "We understand the disappointment and frustration…we were all anticipating and getting ready for the opening of the Valley Line Southeast LRT this summer. Sadly, this will not be possible.
"Once our engineering have completed the design to strengthen the pier and our construction experts have determined the additional construction work required, we will be in a better position to announce the target service commencement date."
The CEO said he's disappointed and apologized to Edmontonians. Joncas added there's no risk to the public and that it's safe to walk and drive under elevated sections along the LRT route.
DELAYS AND DISAPPOINTMENT
Construction started in 2016 and the route was scheduled to open in December 2020, but crews found a large concrete mass under the now open Tawatinâ Bridge in 2018 that delayed construction for months. Officials then delayed the opening date to within 2021, the end of 2021 and summer 2022.
Edmonton Mayor Amarjeet Sohi said the latest delays are "frustrating and deeply disappointing."
"TransEd has not delivered this project as expected. They are responsible for this delay and they will be held accountable to get the work completed and open a line that is safe to ride."
The Valley Line Southeast LRT is a public-private partnership, or P3, between Edmonton and TransEd, Sohi and City Manager Andre Corbould explained. The federal and provincial government also provided funding for the project.
When contracts were signed, the city expected to save about $500 million through the P3, Corbould said.
"We buy a product, we don't design it, we don't engineer it and we don't build it ourselves. Specialists do that," Corbould explained.
Other large projects such as the Walterdale Bridge, the 102 Avenue Bridge and the Metro Line LRT experienced years of issues and delays before they opened.
On Wednesday, Sohi asked administration for a comprehensive review on how the city builds such projects.
Corbould said TransEd will cover the financial costs of the delays.
CTVNews.ca Top Stories
Poilievre will do 'anything to win,' must condemn Alex Jones endorsement: Trudeau
Prime Minister Justin Trudeau is ramping up his attacks on Conservative Leader Pierre Poilievre as he promotes his government's federal budget.
'My stomach dropped': Winnipeg man speaks out after being criminally harassed following single online date
A Winnipeg man said a single date gone wrong led to years of criminal harassment, false arrests, stress and depression.
Ukraine uses long-range missiles secretly provided by U.S. to hit Russian-held areas, officials say
Ukraine for the first time has begun using long-range ballistic missiles provided secretly by the United States, bombing a Russian military airfield in Crimea last week and Russian forces in another occupied area overnight, American officials said Wednesday.
New evidence challenges the Pentagon's account of a horrific attack as the U.S. withdrew from Afghanistan: CNN exclusive
New video evidence uncovered by CNN significantly undermines two Pentagon investigations into an ISIS-K suicide attack outside Kabul airport, during the American withdrawal from Afghanistan in 2021.
'One of the single most terrifying things ever': Ontario couple among passengers on sinking tour boat in Dominican Republic
A Toronto couple are speaking out about their 'extremely dangerous' experience on board a sinking tour boat in the Dominican Republic last week.
All Alberta wildfires to date in 2024 believed to be human-caused: province
There are 63 wildfires burning in Alberta's forest protection area as of Wednesday morning and seven mutual aid fires, including one in the Municipal District of Peace.
7 surveillance videos linked to extortions of South Asian home builders in Edmonton released
The Edmonton Police Service has released a number of surveillance videos related to a series of extortion cases in the city now dubbed 'Project Gaslight.'
Suspects waving weapons, smashing glass in Toronto jewelry store robbery caught on video
Arrests have been made after five men were captured on video rampaging through a jewelry store in Toronto, waving weapons and smashing glass display cases.
Pilot proposes to flight attendant girlfriend in front of passengers
A Polish pilot proposed to his flight attendant girlfriend during a flight from Warsaw to Krakow, and she said yes.