New downtown park, Valley Line West LRT: What's on this year's construction schedule
![Edmonton construction update File photo of construction in Edmonton. (CTV News Edmonton)](/content/dam/ctvnews/en/images/2022/10/25/edmonton-construction-update-1-6125034-1716321255414.jpg)
Progress on some big infrastructure projects is scheduled to be made this construction season.
Marking the third line of major construction on the Valley Line West LRT, crews will build the elevated guideway for the future Misericordia Hospital and West Edmonton Mall stations.
Work will also continue on converting Yellowhead Trail into a free-flowing freeway and Terwillegar Drive's expansion.
The season will also mark the second year of renewal work at William Hawrelak Park.
Landscaping – the final step – at the new Centennial Plaza outside the Stanley Milner Library is slated to be completed, as well. A grand opening date has not yet been set.
Edmonton Public Library's executive director of customer experience said the finished space will increase the downtown core's vibrancy.
"Bringing people from all across the city and beyond to the public library and having a place to really come and gather, it's central to our vision and central to the core of what we do," Sharon Day commented Tuesday morning, speaking during a news conference by the city about the official start of construction season.
Altogether, work will be done on more than 200 projects: about 80 transportation projects, 60 facility projects, 16 LRT expansion and rail projects, and 50 open space projects.
That includes the start of construction on Warehouse Park between 106 Street and 108 Street and Jasper Avenue to 102 Avenue. The project will see 18,100 square metres – much of it parking lots – into green space.
Traffic disruptions caused by construction work will be listed on the city's website.
CTVNews.ca Top Stories
![](https://www.ctvnews.ca/polopoly_fs/1.6979388.1722030190!/httpImage/image.jpg_gen/derivatives/landscape_800/image.jpg)
BREAKING Celine Dion performs at the 2024 Paris Olympics
Beloved Canadian icon Celine Dion made her much-anticipated appearance during the closing of the 2024 Paris Olympic Games opening ceremony.
Jasper wildfire: 'Several weeks' before Jasper can return, premier says
Premier Danielle Smith said Friday afternoon in Hinton while weather conditions are cooler, the Jasper fire is still considered out of control and that Jasper residents can expect to be away from their homes "for several weeks."
'He was just gone': Police ramp up search for vulnerable 3-year-old boy in Mississauga, Ont.
Police in Mississauga are conducting a full-scale search of the city’s biggest park for a non-verbal toddler who went missing Thursday evening. Sgt. Jennifer Trimble told reporters Friday morning that there has been no trace of three-year-old Zaid Abdullah since 6:20 p.m., when he was last seen with his parents in Erindale Park, near Dundas Street West and Mississauga Road.
Driver charged after flashing high beams at approaching police
Orillia OPP arrested and charged a driver with impaired driving after flashing their high beams.
Canada's Christine Sinclair: 'We were never shown drone footage'
Canada soccer great Christine Sinclair said on Friday national team players were never shown drone footage during the more than two decades she was on the team, following a spying scandal that cast a shadow over the Canadians at the Paris Games.
Winnipeg senior's account overdrawn $146,000 for water bill
A Winnipeg senior is getting soaked with a six figure water bill.
Irish museum pulls Sinead O'Connor waxwork after just one day due to backlash
An Irish museum will withdraw a waxwork of singer-songwriter Sinéad O’Connor just one day after installing it, following a backlash from her family and the public, it told CNN in a statement on Friday.
At least 4 buildings burned at Jasper Park Lodge, others damaged: Fairmont memo
The Fairmont Jasper Park Lodge said Thursday afternoon most of its structures are 'standing and intact,' including its iconic main lodge.
She couldn't stop thinking about the guy she met at the Athens Olympics. Then a message from him changed her life
Omaira Gill grew up counting down the days to each Olympic Games. She wasn’t especially sporty, so she ruled out the prospect of competing pretty early on. But she still harboured Olympic dreams – even just spectating would do.